How Jerwan’s Builders Carried a Canal Across a Ravine

In the early seventh century BCE, at Jerwan in what is now northern Iraq, Assyrian builders had to get canal water across a ravine without blocking the stream below. They built a stone aqueduct: a crossing with a paved water channel on top and openings for the stream underneath. The excavation report shows how much of that design survives and where the archaeologists had to fill in the gaps.

Start at the streambed

Picture two routes crossing at different heights. The canal needs a continuous bed from one side of the ravine to the other. The natural stream still needs a way through the low point. A solid wall across the whole ravine would solve only the canal’s problem.

In “The Foundations,” on printed page 8 of the excavation report, architect Seton Lloyd describes a bed of rough boulders below the level of the stream. Large paving stones lay above them, and stone supports called piers rose from that base. Elsewhere along the crossing, the excavators found traces of a foundation that stepped up the sides of the ravine. The foundation followed the changing ground below; the canal didn’t have to follow it down into the streambed.

What the openings tell us

The excavators found enough masonry from the two westernmost openings to work out how the builders had narrowed the gaps above the piers. Instead of setting wedge-shaped blocks around a curve, they laid rows of stone so each projected a little farther into the gap than the one below it. That technique is called corbelling. The surviving steps point to the method even though the openings no longer stand complete. “The Arches” and Figure 4 in the excavation report show the evidence and the reconstruction.

Look at that drawing as two things at once: a record of the stonework that was there and an explanation of how it likely continued. The report’s restoration discussion on printed page 18 identifies the arches and the main parapet, the low wall alongside the canal, as parts of the design that required some guesswork. We can explain how the stream passed through without pretending we know the exact outline of every opening.

Follow the canal across the top

Higher up, the team found surviving stretches of stone paving laid over concrete, as well as remnants of the side walls that helped keep canal water in the channel. The report’s sections on the pavement, concrete and canal parapets describe those remains. That gives the two routes different jobs: the paved channel held and guided the canal water across the ravine, while the openings left a route for the stream below. The surviving wall bases help establish where the side walls went, not how high they stood along the whole crossing.

What the king’s inscription adds

The translated text archaeologists call Inscription B, on printed page 20 of the report, names the Assyrian king Sennacherib. In the king’s account, he had a canal dug to the meadows of Nineveh, his capital, and had the water carried over a stone crossing. Columbia University’s field documentation places Jerwan north of Nineveh and identifies it as part of that wider water system.

The inscription tells us what the king said he built and where he said he sent the water. The masonry helps show how a particular crossing worked. Neither gives us a map of every place the water eventually reached, and the crossing alone doesn’t establish where the Hanging Gardens stood.

That’s the part of Jerwan worth keeping in view: you don’t need the whole structure standing to understand the engineering decision. The canal crossed above, the stream had a route below, and the stonework that remains is enough to see how the builders kept those two jobs separate.

Find more stories about reading ancient engineering from the evidence it left behind in Science, Technology & the Future.


Discover more from Simply Sound Advice

Subscribe to get the latest posts sent to your email.

Share your love

Share your thoughts! Leave a comment...

This site uses Akismet to reduce spam. Learn how your comment data is processed.